CSE: MADI
LAST: -
CONNECT WITH US
MAILING LIST

Morrison River

Overview

The 3,500-hectare Morrison River Property is comprised of 174 unpatented single cell mining claims located in the Morrison River Area in the Red Lake Mining Division of Ontario. The property has a similar geological and structure setting as Ontario’s prolific “Electric Avenue” with high potential for new discoveries.

Location & Geology

The 3,500-hectare Morrison River Property is comprised of 174 unpatented single cell mining claims located in the Morrison River Area in the Red Lake Mining Division of Ontario. The project is in close vicinity to the Trans-Canada highway and railway major transportation arteries.

The property has a similar geological and structure setting as Ontario’s prolific “Electric Avenue”, which is host to four known lithium bearing pegmatite deposits with the emplacement of peraluminous fertile granites host to the spodumene-rich lithium bearing pegmatites. 

Electric Similarities

The Morrison River Property provides evidence for the compositional evolution of pegmatite-forming melts through magmatic crystallization and pegmatite melt - host-rock interactions. Which has significant values of lithium, cesium, tantalum and rubidium.

 The Electric Avenue is host to four known lithium bearing pegmatite deposits with the emplacement of peraluminous fertile granites host to the spodumene-rich lithium bearing pegmatites.

Project Highlights

  • Surface Mapping and Sampling

    Surface mapping and sampling of outcrops will assist in identifying drill targets in conjunction with the planned airborne survey data. Further surface mapping may identify new pegmatites not previously documented.


  • Airborne Survey

    An airborne survey is to be completed as soon as possible to help identify targets for a drill program.


  • Channel Sampling

    Channel sampling is to be conducted on areas of interest previously identified by outcrop mapping and sampling. This sampling may require the stripping of outcrops, as a precaution.


  • Drill Program Design

    Based on the activities outlined above, it is expected a preliminary drill program will be designed to target areas of interest.


  • Permitting

    Enquiries regarding permitting and approvals are underway with a view to begin exploration activities as soon as possible.